Project - Info

Project - Info

Opened from the Info button on the Project ribbon, this window contains information about the Project.

Info.

Created On

System date the Project was entered.

Last Changed

System date of the last change to the Project.

Resource Rate / Fixed Skill Rate

This pull-down menu allows you to select whether to use a Resource Rate (the default) or a Fixed Skill Rate as the default for each of the Project Cost Centres.

  • If Resource Rate is selected: this allows entry of a default Resource Rate for Cost Centres in this Project. This is a number between ‘1’ and ‘10’, which relates to the ten prices on the Resource records. The default for a Resource Rate can be changed to any of the Price lines ‘1’ to ‘10’, from the Resource Record.

  • If Fixed Skill Rate is selected: this allows entry of a default charge out rate for Cost Centres in this Project. Fixed rates do not have the option of uplift.

Levels

Levels are a part of segregation of duties; this allows you to administer user access down to individual record level. The Level is a numeric value between 1 and 9999, 1 being the highest level of access. This gives you the flexibility to deal with even the most complex administrative requirements. Levels are controlled by settings within Security Profiles, and within individual Records. Users are given Levels by the Profile to which they are attached.